Do not use the eaves as a guide instead because they can be uneven.
How to install roll roofing shingles.
Using a measuring tape measure 35 inches 89 cm up from.
For extra durability you may install roll roofing in two layers.
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles.
Drip edge or drip cap is either plastic or sheet metal.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
Install peel and stick roofing in a similar manner.
Repeat this on both sides of the roof.
Install roll roofing measure 35 inches up from the eaves at several intervals along the roof and mark them.
Snap a chalk line as a guide for the first layer roofing.
Cut the rolled roofing.
The strips should always be horizontal.
How to do it attach first course.
Spread the roofing cement along the.
Every 5 inches make a new mark until you get to the rop of the roof.
Prepare a valley between joined roofs by cutting a strip that is 18 inches wide and covers the entire length of the valley.
Mark a chalk line to identify the end of your first layer.
Plan so that no two butt joints are closer than 2 feet from each other.
Use the chalk line to snap a straight line vertically every 6 inches.
It also helps if you first install a layer of roofing felt.
To seal a plumbing vent spread roofing.
To install roll roofing you ll need to cut the material into long strips of the correct length for your roof and lay it flat.
Nail it in place with roofing nails that penetrate at least 3 4 inch into.
It not only protects the roof but it also protects the fascia.
Use a trowel to scoop up the roofing cement.